BOQPilotboqpilot.ioEstimate

QUANTITY SURVEYING · ILLUSTRATIVE CONCEPT

Measure the change before it compounds.

BOQPilot brings quantities, sample market assumptions and variation control into one reviewable costing surface. It has no verified live material-price feed.

Open the illustrative estimator
SAMPLE WORKINGQTY × RATE+ approved variation= visible cost context
4.20 m
7.80 m
01

Quantities should show where they came from.

BUILD THE BOQ

From drawing dimension to accountable line item.

Each sample item keeps unit, quantity, rate assumption and review note together.

A.12Blockwork128 m²Illustrative quantity
B.04Concrete42 m³Illustrative quantity
C.09Roof covering186 m²Illustrative quantity
02 · MATERIAL PRICE TAPE

Keep the date and assumption beside the number.

These values are illustrative placeholders—not live supplier quotes, procurement advice or verified market prices.

CEMENT₦8,400 / sample bagASSUMPTION A
REBAR₦1,240,000 / sample tonneASSUMPTION B
SAND₦52,000 / sample tripASSUMPTION C
ILLUSTRATIVE ESTIMATOR

Build one transparent sample line.

NOT A QUOTE OR LIVE PRICEBase sample amount₦777,000Illustrative varied amount₦815,850
03 · VARIATION CONTROL

Separate the proposed change from the approved baseline.

V-014Proposed

Alternate ceiling specification · fictional

V-011Reviewed

Drainage route adjustment · fictional

V-008Approved sample

Access-door revision · fictional

04 · REVIEW TRAIL

Make each costing decision legible later.

  1. MeasuredSource dimensions attached
  2. PricedAssumption and date visible
  3. ReviewedVariance separated
  4. RecordedSample decision preserved
COST PLANNING BRIEF

Browser-only demonstration. Do not enter project or supplier information.